Centre Aquatique Pré-Saint-Didier

Location
Pré-Saint-Didier (AO) - IT
Retailer
Archeos Costruzioni
Designer
Arch Paolo Pettene studio SdiA
Sector
Wellness
Year
2026
Application
Swimming pools
presaintdidier_009 | Florim

Set within the alpine setting of Prè Saint Didier, the municipal swimming pool redevelops a building originally designed by Gio’ Ponti, enhancing its identity through a contemporary language in dialogue with the landscape. The large glazed surfaces and the combination of wood and concrete define a bright, welcoming space designed for well-being and public use.

The project involved over 4,000 sqm of surfaces, entirely created with Florim solutions. The Maps collection, in White and Light Grey shades, creates visual continuity and enhances natural light, while offering high technical performance in terms of slip resistance, durability and ease of maintenance, all essential in a swimming pool environment.

Subscribe to the newsletter

Subscribe to receive all updates on products, events, and initiatives from the Florim world